NOTE: Close the manual valve for the emulsion flow
before performing this function.
To navigate to the main calibration screen, hold Buttons
1 and 4 for two seconds, then push the button for the
needed function:
• Button 1 - Boom Swing Cylinder calibration screen.
• Button 2 - Slide Gate Cylinder calibration screen.
• Button 3 - Emulsion Valve calibration screen.
• Button 4 - Return to Main Screen
1. Press and hold the emulsion flow button on the
joystick panel to close the emulsion valve, then bump it one time to open. Push
Button 1 and hold momentarily to store that value.
2. Press and hold the emulsion flow button on the
joystick panel to open the emulsion valve, then bump it one time to closed. Push
Button 2 and hold momentarily to store that value.
To exit this screen, press Button 4.
0 Comments